From hospital discharge to a safe shower
1The tall tub wall
After a hospital stay, stepping over a tub wall is the hardest part of the day.
2Text the Safety Hotline
Text Mark (925) 786-0041, or call. You reach Mark, not a call center.
3Mark visits, written price
Mark looks at the bathroom, goes over the discharge needs and gives you one written price.
4The CDU-INC crew, Days 1–4
Minimal demolition, overlays where possible, plumbing kept in line. All materials on hand.
5One complete package
Low step-in, fold-down bench, grab bars, and faucet with handheld wand. You choose the look.
6Home and ready
Usually done in about 4 days, ready for Mom or Dad.
Hospital discharge bathroom safety, usually in about 4 days
- Day 1
Demo, then new waterproof walls and the shower pan go in.
- Day 2
The build continues.
- Day 3
Finishes go in.
- Day 4
Final finishing. Ready to use.
- Minimal demolition
- Overlays where possible
- Plumbing kept in line
- All materials on hand
- Small crew, no big overhead
Illustrations show the process. Every bathroom is different; Mark confirms the details at the home visit.